In task 6 report three design options are defined for further analyses. They are derived from the insights from previous tasks 4 and 5. The first design option is aiming at a reduction of the active and passive materials, while offering a comparable service and thus on a reduction of the GWP due to the used materials. This approach is based on a substitution of the battery cells in the BOM by its successor.The second design option addresses the extension of a products lifetime beyond its 1st life by reuse of the battery system in a same application.
Accordingly, the resulting «additional lifetime» and the FU (Functional Unit) provided during this 2nd life application is calculated. Finally, the third design option focuses on the impact of the energy mix used for the production of the battery system by using a low carbon electricity mix. This last design option is not calculated within this task report due to the limitations of the MEErP EcoReport tool1, making it impracticable to change the electricity related GHG emissions of the production of all the materials within the tool.
Para mayor información visitar el siguiente enlace: